To meet continued enrollment growth, the District will construct a new elementary school to house up to 650 students. The building will include 23 classrooms and construction of playfield, bus and circulation areas and new parking.

Elementary School #17 is currently planned to be located on the same site as the new High School #4.  The proposed site is located at 4200 - 228th Ave. SE, Issaquah, WA 98029 (former location of the Providence Heights College).

Project Information
Original Project Estimate: $38,000,000
Project Budget: $38,000,000
Budget: $38,000,000
Explanation:
Funding source: 2016 Bond
Project status: Planning, Design, and/or Permitting
Architect: Bassetti Architects
Contractor: Skanska
Estimated completion: TBD

March 2021

  • We seem to be back on track with the City of Issaquah concerning moving forward with the site plan. Some fairly minor revisions to the site plan were required to move the process forward.
  • We are currently working with the City of Issaquah Staff to determine a first permit issuance schedule. Currently schedule shows start of construction early August 2021.
  • SDP Application and MSP Applications were submitted 09/25/2020 and deemed complete applications on 10/06/2020. Public comment period was complete on 11/19/2020. We are now awaiting City Staff Land Use review comments on plans that have been submitted.
  • AAS’s for tree save and parking are into the City of Issaquah for review and comment. The AAS process has a public input portion to it.
  • The Design Team continues to work and design the site, the buildings, etc. to make everything as efficient as possible.

January 2021

  • The Design Team and ISD were told this last Monday January 25th that the site plan that has been shared/discussed/shown to the City staff for the last year+, was submitted as part of the SDP/MSP Application and continually refined to meet City staff comments will not meet the FAR portion of the code. This was a major setback to the process. We are continuing to meet with City staff to resolve.
  • SDP Application and MSP Applications were submitted 09/25/2020 and deemed complete applications on 10/06/2020. Public comment period was complete on 11/19/2020.
  • The design team and ISD continue to meet with City Staff to work through the issues of the FAR, retaining wall height and tree-save.
  • The Design Team continues to work and design the site, the buildings, etc. to make everything as efficient as possible.

October/November 2020

  • SDP Application and MSP Applications were submitted 09/25/2020 and deemed complete applications on 10/06/2020. Public comment period is complete 11/19/2020.
  • The design team and ISD continue to meet with City Staff to work through the issues of the FAR, retaining wall height and tree-save.
  • The Design Team continues to work and design the site, the buildings, etc. to make everything as efficient as possible.

September 2020

  • Submittal of the SDP Application and MSP Application is scheduled for 09/25/2020.
    • Submittal was delayed in an attempt to leverage information learned and City Councilmembers comments from the 9/15 City Council Study Session to further our discussions with City Staff concerning the FAR portion of City code prior to application.
  • The Design Team continues to work and design the site, the buildings, etc. to make everything as efficient as possible.

August 2020

  • Completion of responses to the Community Conference are nearing completion. Working with City Staff on final report.
  •  ISD and the Design-Build Team submitted the application for the Site Development Plan (SDP)/Master Site Plan (MSP) in early September.
  • ISD staff and the Design Team continue to work with the COI staff to move the SDP/MSP permitting process along.
  • The Design Team continues to work and design the site, the buildings, etc. to make everything as efficient as possible.

June 2020

  • City of Issaquah has scheduled the Community Conference for July 15, 2020 @ 6:30 p.m.
  • ISD and the Design-Build Team submitted the application for the Site Development Plan (SDP)/Master Site Plan (MSP) Thursday May 28th.
  • ISD staff and the Design Team continue to work with the COI staff to move the SDP/MSP permitting process along.
  • The Design Team continues to work and design the site, the buildings, etc. to make everything as efficient as possible.

January 2020

  • No changes.

November 2019

  • ISD design team and the City of Issaquah staff are working through configurations to narrow down the site, parking and building layout.
  • ISD design team continuing to refine the building designs.
  • ISD and the City planning department are working on rezoning to enable the site to accommodate schools.

April 2018

Site acquisition remains underway.
No photos galleries are available for this project.
Documents
ISD HS#4-ES#17 - SEPA NOTICE OF WITHDRAWAL of MDNS 9-17-21 SIGNED
ISD HS#4-ES#17 - SEPA MDNS Letter 2nd REVISION 08-10-2021
ISD HS#4-ES#17 – Technical Memorandum for Potential Traffic Calming Measures 05-10-2021
UPDATED 08-10-2021 FOR INFORMATION ONLY ISD HS#4-ES#17 - Current Site Plan 08-2021
CORRECTED LINK 08-10-2021 ISD HS#4-ES#17 – Revised Transportation Technical Report Final 02-16-2021
CORRECTED LINK 08-10-2021 ISD HS#4-ES#17 - Transportation Technical Report Volume 2 - Appendices 02-16-2021
ISD HS#4-ES#17 - SEPA Checklist FINAL 07-27-2021 SIGNED
ISD HS#4-ES#17 – Technical Information Report 04-01-2021
ISD HS#4-ES#17 – Geotechnical Report 06-17-2021
ISD HS#4-ES#17 – Preliminary Technical Information Report ROW 02-15-2021
ISD HS#4-ES#17 – Critical Area Study and Wetland Mitigation Plan 07-10-2020
ISD HS#4-ES#17 – Landslide Hazard Assessment 09-24-2019
ISD HS#4-ES#17 – Lighting System Review Summary 04-16-2021
ISD HS#4-ES#17 – Noise Study 09-02-2020
ISD HS#4-ES#17 – Noise Study Addendum 06-04-2021
ISD HS#4-ES#17 – Water Tower Lead in Soil Screening Summary 03-03-2020
ISD HS#4-ES#17 – Updated Traffic Analysis for 228th Avenue ES Near the Site 05-18-2021
ISD HS#4-ES#17 – City of Issaquah SEPA Checklist 2019 Annual Comprehensive Plan Amendments-Zoning Map Amendment 08-28-2019
ISD HS#4-ES#17 – Arborist Report-Tree Evaluation and Retention Report 08-2020
ISD HS#4-ES#17 – City of Issaquah DNS 2019 Annual Comprehensive Plan Amendments-Zoning Map Amendment 10-09-2019